Project description
A smart storage device turns buildings into independent power plants. Energy Intelligence: An independent computing node with built-in AI that analyzes, predicts and optimizes energy consumption in real time. These modules are able to connect to a network, learn from data, instantly respond to changes in the power grid and redistribute energy where it is needed.
Target outcome
To solve the problem of shortage of electrical power in the distribution infrastructure by creating a virtual storage capacity of 1 GWh. Apartment buildings — increase reliability, reduce peak loads of urban networks. Residential housing settlements — compensation for power shortages, increased reliability and reduced loads of regional networks.
Stage
Scaling up sales. Piloting new business models. Cost optimization. Development and implementation of new technological solutions.
Project team
- Contractor
- Watts Battery LLC
- Partners
- RENERA LLC, ROSSETI Moscow Region PJSC, SO UES JSC, NTI Energynet, Frontiers of Science Management Company
Project type
- Funding
- Venture
- Format
- R&D, manufacturing, and sales
Support you are looking for
- Инвестиции в масштабирование проекта
- Привлечение партнёров для запуска проектов в ИЖС и МКД
- Предоставление технологий для реализации отдельных узлов
- Помощь в продвижении и развитии бренда проекта
Roadmap
Scaling up sales and production
Partnership with key developers, architects, and designers in the business and luxury housing markets. Working on pilot projects with new products: 1. Container storage 2. Power grid system limitation management Platform
Team Expansion
formation of the sales department RnD Group Extension Expansion of the service group
Unloading by the ROSSETI power center
Implementation of the pilot for unloading the regional power supply center (MO) by aggregating storage devices in the area and reducing peak load according to schedule (normal mode) and signals (emergency mode)
Protection of FMCG outlets
Pilot implementation of a point of customer service protection system for FMCG retail chains
Product introduction in the MCD
Pilot implementation of the system in apartment buildings (Moscow)
Project description
A smart storage device turns buildings into independent power plants. Energy Intelligence: An independent computing node with built-in AI that analyzes, predicts and optimizes energy consumption in real time. These modules are able to connect to a network, learn from data, instantly respond to changes in the power grid and redistribute energy where it is needed.
Target outcome
To solve the problem of shortage of electrical power in the distribution infrastructure by creating a virtual storage capacity of 1 GWh. Apartment buildings — increase reliability, reduce peak loads of urban networks. Residential housing settlements — compensation for power shortages, increased reliability and reduced loads of regional networks.
Stage
Scaling up sales. Piloting new business models. Cost optimization. Development and implementation of new technological solutions.
Project team
- Contractor
- Watts Battery LLC
- Contacts
- office@wattsbattery.ru, @wattsbattery
Project type
- Funding
- Venture
- Format
- R&D, manufacturing, and sales
Support you are looking for
- Инвестиции в масштабирование проекта
- Привлечение партнёров для запуска проектов в ИЖС и МКД
- Предоставление технологий для реализации отдельных узлов
- Помощь в продвижении и развитии бренда проекта
Roadmap
Partnership with key developers, architects, and designers in the business and luxury housing markets. Working on pilot projects with new products: 1. Container storage 2. Power grid system limitation management Platform
formation of the sales department RnD Group Extension Expansion of the service group
Implementation of the pilot for unloading the regional power supply center (MO) by aggregating storage devices in the area and reducing peak load according to schedule (normal mode) and signals (emergency mode)
Pilot implementation of a point of customer service protection system for FMCG retail chains
Pilot implementation of the system in apartment buildings (Moscow)
Scaling up sales and production
Partnership with key developers, architects, and designers in the business and luxury housing markets. Working on pilot projects with new products: 1. Container storage 2. Power grid system limitation management Platform
Team Expansion
formation of the sales department RnD Group Extension Expansion of the service group
Unloading by the ROSSETI power center
Implementation of the pilot for unloading the regional power supply center (MO) by aggregating storage devices in the area and reducing peak load according to schedule (normal mode) and signals (emergency mode)
Protection of FMCG outlets
Pilot implementation of a point of customer service protection system for FMCG retail chains
Product introduction in the MCD
Pilot implementation of the system in apartment buildings (Moscow)
More projects in «Technology»
«Ex astris, scientia»
